You decided to build a house? Decide whether to cope on your own or will attract specialists? The most reasonable decision is to hire professionals, but you are still not guaranteed a high-quality result.
If you build a frame house with your own hands, the price of work in this case will be much lower. Of course, it is better to entrust some stages of work to contractors, for example, the construction of the foundation, but you yourself will choose building materials, and control their consumption.
Frame construction is an ideal solution for independent construction, in three months you can get solid and durable housing.
Before starting work, select a house project. What will be its area, the number of premises, the number of floors, and so on. For clarity, the main stages of building a house are shown on the Visilla website, you can stages to follow the construction of the house from design to landscape work.
The most crucial stage is the construction of the foundation, the foundations of the future house. Often the cost of the foundation reaches twenty percent of the total estimate, but you should not save. Frame construction from LSTK allows the construction of a simple shallow foundation. But take into account several factors – the type of soil, the level of freezing of the soil, and the location of groundwater, the relief of the site.
The main types of foundations are strip, columnar, pile, slab.
The next stage is the manufacture of the frame. The frame of LSTK is a lot of galvanized steel profiles that need to be collected in a single design. To assemble it, only a screwdriver will be needed.
The roof device involves the installation of a crate, a hydraulic protection film, laying roofing material, vapor barrier, insulation and installation of internal sheathing.
At the end of the work, put windows and doors, lay internal communications, install plumbing. Start the decoration of the premises, installation of electric and gas equipment.