Casseric and conveyor line
With a line of 280 thousand line. M2 of total area use two spans of 140 thousand. each.
The cassette-conveyor line operating according to the method of moving shields is designed to make panels of internal walls and ceilings with a capacity of 140 and 280 thousand. M2 total area per year.
At a line power equal to 140 thousand. M2 of total area per year, molding is carried out in an 18-meter span with an area of 1296 m2. The daily number of molds 27. With bilateral molding per day, 54 products are made. The rhythm of the line is 36 min. The number of sets in the heat treatment zone 13. Heat treatment time 8 hours. After the finish, the panel is withstanding in the workshop for 6 hours. You can buy plastic windows for your office or production here – prices for plastic windows are inexpensive.
With a line of 280 thousand line. M2 of total area per year, molding is also made on two installations in a 18-meter span, but with an area of 2160 m2. Daily number of molds 54. With double -sided molding per day, 108 panels are made. The rhythm of the line 56 min. The number of sets in the heat treatment zone on two lines 28.
Production area. The most profitable in terms of removing products are cassette-conveyor and cassette lines. At a line power 70 thousand. M2 of the total area Removing products on a cassette line is 70% higher than on conveyor with vertical cameras. For other capacities, the highest removal of products has a cassette-conveyor line. Its indicators are 50-80% higher than the closest cassette line with removal chambers.